Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ga-google-analytics domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aploadpt/public_html/wp-includes/functions.php on line 6121
Secondary School ‘Almeida Garrett’ – APLOAD

Secondary School ‘Almeida Garrett’

RUA DR. AUGUSTO MARTINS,
Nº 90, 2º ANDAR, SALA 4,
4470-145 MAIA

Almeida Garrett Secondary School

| Vila Nova de Gaia |
Construction Owner > Parque Escolar, EPE
Project completed in 2010

Completed Work

The expansion of the building resulted in a reduction in the available outdoor space, leading to the need to rethink its entire structure. Given the constraints, the intervention strategy involved qualifying the exterior areas, consolidating different experiences of the space and better integrating the built bodies.