Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ga-google-analytics domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aploadpt/public_html/wp-includes/functions.php on line 6121
Environmental Monitoring – Tua River – APLOAD

Environmental Monitoring – Tua River

RUA DR. AUGUSTO MARTINS,
Nº 90, 2º ANDAR, SALA 4,
4470-145 MAIA

Environmental Monitoring - Tua River

|Rio Tua – Entre Mirandela e Abreiro|

APROVEITAMENTO HIDROELÉCTRICO DE FOZ TUA

Acompanhamento Ambiental – Elemento 49I do RECAPE.

Medidas de Compensação ao Corte de Vegetação Ripícola

 

Cliente > AQUALOGUS – Engenharia e Ambiente 

Dono de Obra > EDP – Gestão de Produção de Energia, S.A.

A proposta pretende assegurar a minimização dos impactes ao nível da vegetação ripícola, em consequência da implementação da Hidroelétrica a jusante, bem perto da Foz do Rio Tua. Desta forma as medidas implementadas na Fase de Projeto de Execução asseguram a recuperação da galeria ripícola ao longo de mais de 20Km de margens. Nas medidas inclui-se a irradicação de espécies invasoras, a plantação de espécies vegetais ripícolas autóctones e a estabilização das margens com recurso a técnicas de bioengenharia. A intervenção assume-se como um contributo para o Equilíbrio Ecológico e para a valorização da qualidade visual e cénica da paisagem.