Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ga-google-analytics domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aploadpt/public_html/wp-includes/functions.php on line 6121
Lenta Beach – APLOAD

Lenta Beach

RUA DR. AUGUSTO MARTINS,
Nº 90, 2º ANDAR, SALA 4,
4470-145 MAIA

Lenta Beach

Praia da Lenta – Assessment of Existing Vegetation and Intervention Proposal
Client: HPN – Consultores de Engenharia, S.A.
Construction Owner > Vila Nova de Cerveira City Council
Study completed in 2010
The study prepared by APLOAD emerged in the context of a Preliminary Study for the Environmental Enhancement Project for the Praia da Lenta Zone, and aims to evaluate the existing situation from the point of view of vegetation, identifying the most pressing problems, and more appropriate intervention solutions.