Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ga-google-analytics domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aploadpt/public_html/wp-includes/functions.php on line 6121
Av- 25 Abril – Vendas Novas – APLOAD

Av- 25 Abril – Vendas Novas

RUA DR. AUGUSTO MARTINS,
Nº 90, 2º ANDAR, SALA 4,
4470-145 MAIA

Development of cycle path and pedestrian path projects to connect Av. 25 de Abril, the Sports and Exhibition Park and the secondary schools and C+S, Vendas Novas Client: Vendas Novas Municipal Council

Proposal for intervention on existing road axes, by defining the layout of the cycle path, the pedestrian walkway (and respective technical lanes and rough lanes), tactile marking of pedestrian crossings, car parking areas, urban furniture, among others. The unity of the entire inclusive urban design is achieved with the articulation of the green structure, which is intended to be continuous, integrated and cohesive.